Clem Miller Environmental Education Center

Project Description

Client: National Park Services
Location: Clem Miller Environmental Education Center, Point Reyes Station,  CA
Value: $179,000

This project consisted of concrete and carpentry work that was to create ADA accessible pathways throughout the education site. It also included the design and build of an ADA accessible ramp and stairs to a building that did not have ADA access. As well as, an ADA parking spot and demo and repair of two back door stairways.

Eagle Pass Bridge

Project Description

Client: US Army Corp of Engineers
Location: Eagle Pass, TX
Value: $2.9M

This  is a design/bid/build project of a new, 95’ span, single-lane access bridge for US Customs and Border Protection across the Eagle Pass Creek. The project entailed the construction of a pre-cast and cast-in-place concrete girder bridge over the Eagle Pass Creek. The creek runs through the Eagle Pass Golf Course and provides storm drainage for the southern part of Eagle Pass. The bridge structure consists of 4, TEXDOT (Texas Department of Transportation) Type 4B40 box girder beams. These beams were fabricated in San Antonio, Texas and transported to the site for placement. The bridge deck consists of cast-in-place slab with cast-in-place concrete barrier. The slab is 6” thick and conventionally reinforced. On either side of the bridge, new approach roads were constructed. A gravel road on one side and an asphalt one on the other side. Additional site work included directional and speed limit signage, seeding and planting, new gabion baskets and general site grading for the new approached.

Reelfoot Maintenance Facility - Martinez Construction Company

Reelfoot Maintenance Facility

Reelfoot Maintenance Facility - Martinez Construction Company

Project Description

Client:   U.S. Fish and Wildlife Services
Location:   Reelfoot, TN
Value: $719,981

Martinez Construction Services was the lead design firm and provided civil and structural engineering for this new warehouse and maintenance shop for the FWS in Tennessee.  The design/build project was completed on an accelerated schedule and included the design of the building as well as site improvements.   Site improvements included new parking aprons, drainage design, site and building utilities and security improvements.  The building design included the complete architectural, structural, mechanical and electrical design for the facility.   Included in the design are a new office and crew room, storage mezzanine and restrooms.

Missile Launch Facility - Martinez Construction Company

Missile Launch Facility

Missile Launch Facility - Martinez Construction Company

Project Description

Client:   NAVFAC Southwest
Location:   San Nicolas Island, CA
Value: $2.2M

Martinez Construction Services was the lead design firm for this design/build project and provided in-house civil and structural engineering.  The project consisted of the design and construction of a new missile launch facility at Rock Crusher Point on the island and the renovation of an existing hangar for use as a Payload Assembly Area for the launch vehicles.  The work was completed under an extremely tight design and construction schedule.  The remote nature of the island required careful planning between the design and construction portions of the team.  The exposed nature of the site also required design considerations for corrosion of the concrete and steel components. The Payload Assembly Area is a lab / tech room to be used for assembly and testing of the launch vehicles’ electronics and tracking systems.  The room was designed to accommodate the clean nature of the work and to provide adequate ventilation and lighting for the technicians using the facility.  

Naval Communications Towers - Martinez Construction Services

Naval Communications Towers

Naval Communications Towers - Martinez Construction Services

Project Description

Client:   NAVFAC Southwest
Location:   Various in CA and AZ
Value: $3.5M

Martinez Construction Services was the lead design firm for this design/build project. Provided the design of foundations, site improvements, control shelters, emergency generators and fuel tanks for eight large radio communications towers for the US Navy at sites in Southern California and Arizona.  The towers were located at remote, mountain top locations on the Navy’s weapons ranges.   We developed a pre-cast foundation system that allowed for pre-construction of the major elements so they could be transported to the remote sites.   Design also included security fencing, site grading and drainage and electrical systems.

Papago Farms FOB Well and Gate - Martinez Construction Services

Papago Farms FOB, Papago Farms Well & Gate

Papago Farms FOB Well and Gate - Martinez Construction Services

Project Description

Client:   Department of Homeland Security, Customs and Border Protection
Location:   Papago Farms FOB, Sells, AZ
Value$585,000

Design/build of a new deep well, reverse osmosis treatment system, site infrastructure, and rolling gate. Includes the installation of a new aluminum sliding gate with operator and controls to include site infrastructure. Install a new pedestrian gate at the existing perimeter fencing. New gate area to include grading, new concrete slab, vehicle detection loops, protective bollards and necessary fencing to tie into existing fencing.

Brian A Terry Border Patrol Station - Martinez Construction Services

Brian A Terry Border Patrol Station, Site Work and Repairs

Brian A Terry Border Patrol Station - Martinez Construction Services

Project Description

Client:   Homeland Security, Border Protection Services
Location:   Brian A Terry Border Patrol Station, Naco, AZ
Value: $240,000

Project included repair and alterations of the drainage systems at the station, cleaning out the detention basins, reestablishing the existing drainage swales, installing new drainage culverts, installing new rip rap and flow protection to minimize future erosion, removal, regrading and repaving the existing parking lot to correct the drainage pattern and minor alterations for the site utilities and utility boxes.